CLEANSUITE® Case Study Video (Parkview)

Parkview Hospital – Pueblo, CO

Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

Renovating two OR Suites in this 350 bed facility included replacement of the original horizontal flow air delivery system with a vertical laminar flow system with up to 100 air changes per hour. Each suite created engineering challenges requiring support for 3 booms each within an 18" space. Installation was accomplished in 1/6 the normal time for a fieldbuilt system.